50.142.1 Underslab Assembly - Grade Beam
50.323.2 Blindside Vertical Tieback - Detensioned - 24" Sonotube Or Framed Blockout (Min. 18")
SPECIFICATION 2020 NovaTak Guide Specification
System Information Sheet NovaTak
50.100.1 UNDERSLAB ASSEMBLY
50.100.2 Underslab Assembly - With Protection Slab
50.100.3 Underslab Assembly - With Base And Protection Slab
50.100.4 Underslab Assembly - With Base Slab
50.110.6 NovaTak Lap Seams
50.116.1 Underslab - Field Laps
50.120.1 Underslab Penetration - Conduit Or Pipe
50.120.1 UNDERSLAB PIPE PENETRATION
50.120.2 Underslab Penetration - Conduit Or Pipe With Base Slab
50.121.1 Underslab Penetration - Precast Pile
50.122.1 Underslab Penetration - Auger Cast Pile
50.122.2 Underslab Penetration - Auger Cast Pile W/ Base Slab
50.122.3 UNDERSLAB AUGER CAST PILE PENETRATION w BASE & PROTECTION SLAB
50.122.4 Underslab Penetration - Auger Cast Pile W/ Multiple Rebar W/ Base & Protection Slab
50.127.1 Underslab Penetration - Dewatering Pipe
50.128.2 Underslab Penetration - Multi-Conduit/Pipe Bundle With Limited Annular Space
50.133.1.1 Underslab Assembly - Pile Cap (Non-Hydrostatic)
50.133.1.2 Underslab Assembly - Pile Cap (Hydrostatic)
50.133.1.3 UNDERSLAB ASSEMBLY - PILE CAP (HYDROSTATIC)
50.133.1.3 UNDERSLAB ASSEMBLY - PILE CAP (HYDROSTATIC)
50.140.1 Underslab Assembly - Vertical Transition - Wood Lagging
50.140.2 Underslab Assembly - Vertical Transition - Shotcrete Shoring
50.142.2 Underslab Assembly - Grade Beam - Sloped
50.143.1.21 Underslab Assembly - Vertical Transition - HydroGel Post-Applied System
50.143.1.55 Underslab Assembly - Vertical Transition - PrimeTak Post-Applied System
50.144.1.1.02 Underslab Assembly - Offset Slab Transition - E.Protect Wall Assembly (Option 1)
50.144.1.2.02 Underslab Assembly - Offset Slab Transition - E.Protect Wall Assembly (Option 2)
50.144.1.55 Underslab Assembly - Offset Matslab Transition - PrimeTak Post-Applied System
50.145.1.55 Underslab Assembly - Stepped Footing Transition - PrimeTak Post-Applied System
50.150.1 Underslab Assembly - Isometric - W/ Compacted/Soil Base & Protection Slab
50.150.2 Underslab Assembly - Isometric - W/ Base & Protection Slab
50.170.1 Underslab Assembly - Repair - Puncture / Tears Under 2"
50.170.2.1 Underslab Assembly - Repair - Punctures / Tears 2" Or Greater (Positive Lap Seam)
50.170.2.2 Underslab Assembly - Repair - Punctures / Tears 2" Or Greater (Sandwich Seam)
50.170.2.3 Underslab Assembly - Repair - Punctures / Tears 2" Or Greater (Reinforced Seam)
50.300.1 SHORING ASSEMBLY
50.300.1.1 Blindside Vertical Assembly - Wood Lagging with Insulation
50.300.1.2 Blindside Vertical Assembly - Wood Lagging with Protection Board
50.300.2 Blindside Vertical Assembly - Shotcrete Shoring
50.300.3 Blindside Vertical Assembly - Soil Mix Shoring
50.302.1.1 Blindside Vertical Assembly - Back Lagging At Soldier Pile (Non-Hydrostatic)
50.302.1.2 Blindside Vertical Assembly - Back Lagging At Soldier Pile (Hydrostatic)
50.302.2.1 Blindside Vertical Assembly - Back Lagging At Soldier Pile (Non-Hydrostatic)
50.302.2.2 Blindside Vertical Assembly - Back Lagging At Soldier Pile (Hydrostatic)
50.302.3 Blindside Vertical Assembly - Back Lagging At Soldier Pile - Canted Flage Fill
50.302.4 Blindside Vertical Assembly - Back Lagging At Soldier Pile - Square Flage Fill
50.303.3 Blindside Vertical Assembly - Sheet Pile - Backfilled W/ Plywood - W/ Drainage Course
50.303.4 Blindside Vertical Assembly - Sheet Pile - Backfilled W/ Plywood - No Drainage Course
50.310.6 Vertical Lap Seams - Plan View
50.310.6 Vertical Lap Seams - Plan View
50.313.1 Blindside Vertical Assembly - Repair - Fasteners (Hydrostatic & Non-Hydrostatic)
50.316.1.1 SHORING WALL - FIELD LAPS - WALL HEIGHT UP TO 10 FEET
50.316.1.2 SHORING WALL - FIELD LAPS - WALL HEIGHT GREATER THAN 10 FEET
50.320.1 Blindside Vertical Penetration - Wood Lagging
50.320.1 VERTICAL PIPE PENETRATION - FIELD MANUFACTURED PIPE COLLAR
50.320.2 Blindside Vertical Penetration - Shotcrete / Soil Mix Shoring
50.321.2 Blindside Vertical Penetration - Dowel / Rebar
50.321.4 SHOTCRETE SHORING ASSEMBLY WITH POST APPLIED REBAR PENETRATION
50.321.5.1 Blindside Vertical Penetration - Eye Lag Screw (Non-Hydrostatic)
50.321.5.2 Blindside Vertical Penetration - Eye Lag Screw (Hydrostatic)
50.323.3 Blindside Vertical Tieback - Detensioned - 24" Sonotube Or Framed Blockout (Min. 18") W/ Cut-Off Head
50.324.1 Non-Detensioned Tie Back With No Blockout
50.325.1 Blindside Vertical Penetration - Raker / Waler
50.326.3 Blindside Vertical Penetration - Nelson Stud
50.328.1 Blindside Vertical Penetration - Multi-Conduit/Pipe Bundle With Limited Annular Space - Wood Lagging
50.328.2 Blindside Vertical Penetration - Multi-Conduit/Pipe Bundle With Limited Annular Space -Shotcrete
50.330.1 Underslab Assembly- Vertical Transition - Footing Discharge Pipe With Base Slab
50.330.2 Underslab Assembly- Vertical Transition - Footing Discharge Pipe
50.331.1 Blindside Vertical Assembly - Grade Termination - Reinforcement Flashing W/ E.Roll
50.331.1.1 Blindside Vertical Assembly - Grade Termination - Reinforcement Flashing W/ PrimeTak
50.331.2 Blindside Vertical Assembly - Grade Termination - Reinforcement Flashing W/ E.Roll W/ Cement Board
50.331.2.1 Blindside Vertical Assembly - Grade Termination - Reinforcement Flashing W/ PrimeTak W/ Cement Board
50.331.3 Blindside Vertical Assembly - Grade Termination - Limited Access
50.331.4 Blindside Vertical Assembly - Grade Termination - Top Of Wall
50.370.3 Blindside Vertical Assembly - Plan View - Expansion Joint
50.381.2 Corner - Outside - Field Formed
50.381.3.1 Corner - Inside - Field Formed
50.381.4 Corner - Topside - Inside - Field Formed
50.381.5 Corner - Topside - Outside - Field Formed
50.390.1 INSTALLING OVER WOOD LAGGING AND STEEL PILES