County of Los Angeles Approval
SPECIFICATION 2018 E.Protect+ Decks
SPECIFICATION 2019 E.Protect+ Green Roof
System Overview E.Protect+ Deck
1.240.1.03 E.Proformance Wall Assembly Transition to E.Protect+ Deck Assembly
1.240.2.03 E.Proformance Wall Assembly Transition to E.Protect+ Deck Assembly w/Concrete Topping
1.240.3.03 E.Proformance Wall Assembly Transition to E.Protect+ Deck Assembly w/Asphalt Topping
1.240.4.03 E.Proformance Wall Assembly Transition to E.Protect+ Deck Assembly w/Pedestal Pavers
1.340.1.1.03 E.Proformance Shoring Wall Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly
1.340.2.1.03 E.Proformance Shoring Wall Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly with Concrete Topping
1.340.3.1.03 E.Proformance Shoring Wall Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly with Asphalt Topping
1.340.4.1.02 E.Proformance Shoring Wall Assembly - Wood Lagging - Transition to E.Protect Deck Assembly with Pedestal Pavers
1.340.4.1.03 E.Proformance Shoring Wall Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly with Pedestal Pavers
14.340.1.1.03 E.Proformance Slipsheet Shoring Wall Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly
14.340.2.1.03 E.Proformance Slipsheet Shoring Wall Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly with Concrete Topping
14.340.3.1.03 E.Proformance Slipsheet Shoring Wall Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly with Asphalt Topping
14.340.4.1.03 E.Proformance Slipsheet Shoring Wall Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly with Pedestal Pavers
15.340.1.1.03 E.Proformance M Shoring Wall Vapor Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly
15.340.2.1.03 E.Proformance M Shoring Wall Vapor Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly with Concrete Topping
15.340.3.1.03 E.Proformance M Shoring Wall Vapor Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly with Asphalt Topping
15.340.4.1.03 E.Proformance M Shoring Wall Vapor Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly with Pedestal Paver
2.240.1.03 E.Protect Wall Assembly Transition to E.Protect+ Deck Assembly
2.240.2.03 E.Protect Wall Assembly Transition to E.Protect+ Deck Assembly w/Concrete Topping
2.240.3.03 E.Protect Wall Assembly Transition to E.Protect+ Deck Assembly w/Asphalt Topping
2.240.4.03 E.Protect Wall Assembly Transition to E.Protect+ Deck Assembly w/Pedestal Pavers
2.340.1.1.03 E.Protect Shoring Wall Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly
2.340.3.1.03 E.Protect Shoring Wall Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly with Asphalt Topping
2.340.4.1.03 E.Protect Shoring Wall Assembly - Wood Lagging - Transition to E.Protect+ Deck Assembly with Pedestal Pavers
3.240.1 Wall Assembly Transition to Deck Assembly
3.240.2 Wall Assembly Transition to Deck Assembly w/Concrete Topping
3.240.3 Wall Assembly Transition to Deck Assembly w/Asphalt Topping
3.240.4 Wall Assembly Transition to Deck Assembly w/Pedestal Pavers
3.340.1.1 Shoring Wall Assembly - Wood Lagging - Transition to Deck Assembly
3.340.2.1 Shoring Wall Assembly - Wood Lagging - Transition to Deck Assembly with Concrete Topping
3.340.3.1 Shoring Wall Assembly - Wood Lagging - Transition to Deck Assembly with Asphalt Topping
3.340.4.1 Shoring Wall Assembly - Wood Lagging - Transition to Deck Assembly with Pedestal Pavers
3.400.2 Insulated Deck Assembly
3.400.3 Pedestal Paver Deck Standard Assembly
3.400.4 Insulated Pedestal Paver Deck Standard Assembly
3.400.5 Paver on Mortar Bed Deck Standard Assembly
3.400.6 Paver on Sand Bed Deck Standard Assembly
3.410.1 Deck Protection Course Overlap
3.412.1 Concrete Deck Control Joint
3.420.1 Deck Pipe Penetration
3.430.1 Deck Assembly Termination Detail
3.431.1 Deck Planter Termination Assembly
3.451.1 DECK CRACK 1/16" OR LESS
3.452.1 DECK CRACK 1/4" OR LESS, GREATER THAN 1/16"
3.470.1 DECK PIPE PENETRATION REPAIR