14.320.2.1 Shoring Pipe Penetration with Link-Seal with Post Excavation of Penetration
14.330.1 SHORING SLIPSHEET PERIMETER FOOTING with DRAIN SIDE OUT
County of Los Angeles Approval
SPECIFICATION 2018 E.Proformance Shoring Slipsheet
System Overview E.Proformance Slipsheet
1.140.1.12 E.Proformance Underslab Assembly Transition to E.Proformance S Shoring Slipsheet Assembly
1.140.2.12 E.Proformance Unsderslab Assembly Transition to E.Proformance S Shotcrete Shoring Slipsheet Assembly
1.140.3.12 E.Proformance Underslab Assembly Transition to E.Proformance S Sheet Pile Shoring Slipsheet Assembly
14.140.1 Underslab Transition Mat Slab to Shoring Slipsheet
14.140.2 Underslab Transition Mat Slab to Shotcrete Shoring Slipsheet
14.140.3 Underslab Slipsheet Transition Mat Slab to Sheet Pile Shoring
14.140.3.1 Underslab Slipsheet Transition Mat Slab to Sheet Pile Shoring and Pile Foundation
14.300.1 Shoring Slipsheet Assembly
14.300.1.1 Shoring Slipsheet Assembly with Insulation
14.300.2 Shotcrete Shoring Slipsheet Assembly
14.301.1 Shoring Slipsheet Soil Nail Assembly
14.302.1 Shoring Slipsheet Back Lagging Assembly
14.303.1 Sheet Pile Slipsheet Assembly
14.303.2 Sheet Pile Slipsheet Assembly w/Plywood
14.303.3 Sheet Pile Slipsheet Assembly w/Plywood & No Drainboard
14.310.2 Shoring E.Base 205 Overlap
14.311.3 Shotcrete Shoring Slipsheet Fastener Detail
14.320.1 Shoring Slipsheet Penetration Pipe
14.320.2 Shoring Slipsheet Penetration Pipe Link-Seal
14.321.1 Shoring Slipsheet Penetration Rebar Wire Tie
14.321.2 Shoring Slipsheet Penetration Rebar Wire Tie e.stop Option
14.322.1 Shoring Slipsheet Single Bar Tie Back Non-Detentioned
14.322.2 Shoring Slipsheet Multiple Cable Tie Back Non-Detentioned
14.324.1 Shoring Slipsheet Single Bar Tie Back Cover
14.325.1 Shoring Slipsheet Penetration Raker Detail
14.327.2 Shotcrete Shoring Slipsheet Assembly @ Soil Nail Blockout
14.330.2 SHOTCRETE SHORING SLIPSHEET PERIMETER FOOTING with DRAIN SIDE OUT
14.331.1 Shoring Slipsheet Termination @ Grade
14.331.2 Shoring Slipsheet Termination @ Grade w Cementitiuos Board
14.331.3 Shoring Slipsheet Termination w Limited Access
14.332.2 Shotcrete Shoring Slipsheet Termination @ Roof Line
14.340.1 Shoring Slipsheet Transition to E.Protect+ Deck
14.340.2 Shoring Slipsheet Transition to E.Protect+ Deck Concrete Topping
14.340.3 Shoring Slipsheet Transition to E.Protect+ Deck Asphalt Topping
14.340.3.17 E.Proformance S Shoring Assembly Transition to Hot Fluid Applied
14.340.4 Shoring Slipsheet Transition to E.Protect+ Deck Pavers
14.341.1 Shoring Slipsheet Transition to E.Protect Deck
14.341.2 Shoring Slipsheet Transition to E.Protect Deck Concrete Topping
14.341.3 Shoring Slipsheet Transition to E.Protect Deck Asphalt Topping
14.341.4 Shoring Slipsheet Transition to E.Protect Deck Pavers
14.360.1 Shoring Slipsheet Cross Strap Preparation
15.140.1.12 UNDERSLAB ASSEMBLY TRANSITION TO SHORING SHIPSHEET ASSEMBLY