E.Proformance Slipsheet

E.Proformance Slipsheet is a redundant field-installed composite waterproofing system for below-grade pre-applied blindside vertical wall protection, and provides a variation to the standard E.Proformance Shoring system to accommodate for the shrinkage of below grade vertical walls. 60 mils of e.spray is applied directly to the geotextile face of e.base 205 to provide a tenacious mechanical bond directly to the foundation wall.

E.Proformance Slipsheet is ideal for sites with underslab drainage, minimal waterproofing risk or in conjunction with other E.Series systems after transitioning above the water table.

It is compatible with cast-in-place poured concrete or shotcrete, and may be applied to different types of shoring methods including soldier pile, back lagging, shotcrete soil nail, internal rakers, caissons, secant walls and sheet piles.
E.Proformance Slipsheet has several benefits:

  • Fully bonds with the below-grade foundation wall.
  • Seamless.
  • Installs quickly with less weather sensitivity compared to comparable competitive systems and does not require additional protection against weather.
  • Fabric reinforcement enhances overall strength.
Shoring – Pre-Applied Vertical Protection System
Thickness: 70 to 75 mils
1st Layer: e.drain 6000
2nd Layer: e.base 205
3rd Layer: e.spray

Providing a variation to the standard E.Proformance Shoring system to accommodate for the shrinkage of below grade vertical walls, 60 mils of e.spray is applied directly to the geotexile face of e.base 205 to provide a tenacious bond directly to the concrete wall. E.Proformance Slipsheet is ideal for sites with underslab drainage, minimal waterproofing risk, or in conjunction with other E.Series systems after transitioning above the water table.

It is compatible with cast-in-place poured concrete or shotcrete, and may be applied to different types of shoring methods including soldier pile, back lagging, shotcrete soil nail, internal rakers, caissons, secant walls, and sheet piles.

14.320.2.1 Shoring Pipe Penetration with Link-Seal with Post Excavation of Penetration
14.330.1 SHORING SLIPSHEET PERIMETER FOOTING with DRAIN SIDE OUT
E.Series
County of Los Angeles Approval
E.Series
NSF Approval 2015
SPECIFICATION 2018 E.Proformance Shoring Slipsheet
E.Series
PDS e.adhesive
E.Series
PDS e.base 205
E.Series
PDS e.catalyst
E.Series
PDS e.drain 6000
E.Series
PDS e.spray
Epro
PDS e.stop b
Epro
PDS e.stop hpl
E.Series
SDS Calcium Chloride
E.Series
SDS e.adhesive
E.Series
SDS e.base 205
E.Series
SDS e.catalyst
E.Series
SDS e.drain
E.Series
SDS e.drain 6000
E.Series
SDS e.spray
E.Series
SDS e.stop b
Epro
SDS e.stop hpl
E.Series
SDS e.trowel
E.Series
EPRO Brochure
System Overview E.Proformance Slipsheet
E.Series
1.140.1.12 E.Proformance Underslab Assembly Transition to E.Proformance S Shoring Slipsheet Assembly
E.Series
1.140.2.12 E.Proformance Unsderslab Assembly Transition to E.Proformance S Shotcrete Shoring Slipsheet Assembly
E.Series
1.140.3.12 E.Proformance Underslab Assembly Transition to E.Proformance S Sheet Pile Shoring Slipsheet Assembly
14.140.1 Underslab Transition Mat Slab to Shoring Slipsheet
14.140.2 Underslab Transition Mat Slab to Shotcrete Shoring Slipsheet
14.140.3 Underslab Slipsheet Transition Mat Slab to Sheet Pile Shoring
14.140.3.1 Underslab Slipsheet Transition Mat Slab to Sheet Pile Shoring and Pile Foundation
14.300.1 Shoring Slipsheet Assembly
14.300.1.1 Shoring Slipsheet Assembly with Insulation
14.300.2 Shotcrete Shoring Slipsheet Assembly
14.301.1 Shoring Slipsheet Soil Nail Assembly
14.302.1 Shoring Slipsheet Back Lagging Assembly
14.303.1 Sheet Pile Slipsheet Assembly
14.303.2 Sheet Pile Slipsheet Assembly w/Plywood
14.303.3 Sheet Pile Slipsheet Assembly w/Plywood & No Drainboard
14.310.2 Shoring E.Base 205 Overlap
14.311.3 Shotcrete Shoring Slipsheet Fastener Detail
14.320.1 Shoring Slipsheet Penetration Pipe
14.320.2 Shoring Slipsheet Penetration Pipe Link-Seal
14.321.1 Shoring Slipsheet Penetration Rebar Wire Tie
14.321.2 Shoring Slipsheet Penetration Rebar Wire Tie e.stop Option
14.322.1 Shoring Slipsheet Single Bar Tie Back Non-Detentioned
14.322.2 Shoring Slipsheet Multiple Cable Tie Back Non-Detentioned
14.324.1 Shoring Slipsheet Single Bar Tie Back Cover
14.325.1 Shoring Slipsheet Penetration Raker Detail
14.327.2 Shotcrete Shoring Slipsheet Assembly @ Soil Nail Blockout
14.330.2 SHOTCRETE SHORING SLIPSHEET PERIMETER FOOTING with DRAIN SIDE OUT
14.331.1 Shoring Slipsheet Termination @ Grade
14.331.2 Shoring Slipsheet Termination @ Grade w Cementitiuos Board
14.331.3 Shoring Slipsheet Termination w Limited Access
14.332.2 Shotcrete Shoring Slipsheet Termination @ Roof Line
14.340.1 Shoring Slipsheet Transition to E.Protect+ Deck
14.340.2 Shoring Slipsheet Transition to E.Protect+ Deck Concrete Topping
14.340.3 Shoring Slipsheet Transition to E.Protect+ Deck Asphalt Topping
14.340.3.17 E.Proformance S Shoring Assembly Transition to Hot Fluid Applied
14.340.4 Shoring Slipsheet Transition to E.Protect+ Deck Pavers
14.341.1 Shoring Slipsheet Transition to E.Protect Deck
14.341.2 Shoring Slipsheet Transition to E.Protect Deck Concrete Topping
14.341.3 Shoring Slipsheet Transition to E.Protect Deck Asphalt Topping
14.341.4 Shoring Slipsheet Transition to E.Protect Deck Pavers
14.360.1 Shoring Slipsheet Cross Strap Preparation
E.Series
15.140.1.12 UNDERSLAB ASSEMBLY TRANSITION TO SHORING SHIPSHEET ASSEMBLY