PreTak / Pre-Applied Horizontal with Heat Welded Seams
Highlights
Surpasses other fully adhered HDPE membrane systems by achieving the ideal blend between value and performance.
Prevents lateral water migration by forming a continuous adhesive bond to poured-in-place concrete and shotcrete.
Double width rolls reduce seams and labor.
Suitable for a variety of critical building envelope applications, challenging site conditions and contaminated soils.
More than 25 years of a successful track record of performance on projects around the world.
Heat weld capable for unsurpassed watertight seam performance and ground contaminant site protection.
Technical Resources
Approvals & Endorsements
PreTak City of LA Approval
PDF
Architectural Drawings
51.121.1.4.4 UNDERSLAB PENETRATION - RAISED PILE CAP WITH FULL ENCAPSULATION - NON-HYDROSTATIC
PDF DWG51.143.1.1.21 Underslab Assembly - Vertical Transition - Hydrogel Post-Applied System (Option 1)
PDF DWG51.143.1.1.55 Underslab Assembly - Vertical Transition - PrimeTak Post-Applied System (Option 1)
PDF DWG51.143.1.2.21 Underslab Assembly - Vertical Transition - HydroGel Post-Applied System (Option 2)
PDF DWG51.143.1.2.55 Underslab Assembly - Vertical Transition - PrimeTak Post-Applied System (Option 2)
PDF DWG51.143.1.3.21 Underslab Assembly - Vertical Transition - HydroGel Post-Applied System (Option 3)
PDF DWG51.143.1.3.55 Underslab Assembly - Vertical Transition - PrimeTak Post-Applied System (Option 3)
PDF DWG51.144.1.1.02 Underslab Assembly - Offset Slab Transition - E.Protect Wall Assembly (Option 1)
PDF DWG51.144.1.2.02 Underslab Assembly - Offset Slab Transition - E.Protect Wall Assembly (Option 2)
PDF DWG51.303.2 Blindside Vertical Assembly - Sheet Pile - Backfilled With Plywood - With Drainage Course
PDF DWG51.303.3 Blindside Vertical Assembly - Sheet Pile - Backfilled With Plywood - No Drainage Course
PDF DWG51.321.3.1 Blindside Vertical Penetration - Shotcrete Shoring - Dowel & Rebar (Non-Hydrostatic)
PDF DWG51.323.2 Blindside Vertical Tieback - Detensioned - 24" Sonotube Or Framed Blockout (Min. 18")
PDF DWG51.323.3 Blindside Vertical Tieback - Detensioned - 24" Sonotube Or Framed Blockout (Min. 18") With Cut-Off Head (Option 1)
PDF DWG51.323.4 Blindside Vertical Tieback - Detensioned - 24" Sonotube Or Framed Blockout (Min. 18") With Cut-Off Head (Option 2)
PDF DWG51.328.3 Blindside Vertical Penetration - Multi-Conduit/Pipe Bundle With Limited Annular Space - SOE/Wood Lagging
PDF DWG51.328.4 Blindside Vertical Penetration - Multi-Conduit/Pipe Bundle With Limited Annular Space - Shotcrete
PDF DWG51.331.1 Blindside Vertical Assembly - Grade Termination - Reinforcement Flashing With E.Roll
PDF DWG51.331.1.1 Blindside Vertical Assembly - Grade Termination - Reinforcement Flashing With Primetak
PDF DWG51.331.2 Blindside Vertical Assembly - Grade Termination - Reinforcement Flashing With E.Roll With Cement Board
PDF DWG51.331.2.1 Blindside Vertical Assembly - Grade Termination - Reinforcement Flashing With PrimeTak With Cement Board
PDF DWG51.340.1.1.1.23 Shoring to Deck Transition - PreTak to Suspended Slab Construction Joint (Option 1)
PDF DWG51.340.1.1.2.23 Shoring to Deck Transition - PreTak to Suspended Slab Construction Joint (Option 2)
PDF DWG51.340.1.1.55 Wall to Deck Transition - Non-Hydrostatic - Wall PreTak to Suspended Slab Construction Joint
PDF DWG51.340.1.2.55 Wall to Deck Transition - Hydrostatic - Wall PreTak to Suspended Slab Construction Joint
PDF DWG51.340.2.1.1.23 Shoring to Deck Transition - PreTak Extended to Top of Suspended Slab (Option 1)
PDF DWG51.340.2.1.2.23 Shoring to Deck Transition - PreTak Extended to Top of Suspended Slab (Option 2)
PDF DWG
Product Data Sheets
Safety Data Sheets
Image Gallery
Related Systems
E.Protect+
The most redundant and highest level of below-grade hydrostatic waterproofing protection available
See Product DetailsE.Protect
Redundant composite system that balances performance and budget considerations.
See Product Details