3.242.1 Wall Assembly Transition to Deck Assembly w/Asphalt Topping
County of Los Angeles Approval
SPECIFICATION 2018 E.Protect+ Below Grade
SPECIFICATION 2018 E.Protect+ Walls
System Overview E.Protect+ Wall
3.201.1 Wall Bottom Positive Side
3.201.2 Wall Bottom w/Site Drain Positive Side
3.210.4 Wall E.Shield 110B Overlap
3.211.1 Concrete Wall Seismic Expansion Joint
3.212.1 Concrete Wall Control Joint
3.220.1 Wall Pipe Penetration
3.230.1 Wall Termination @ Grade
3.240.1 Wall Assembly Transition to Deck Assembly
3.240.2 Wall Transition to E.Protect+ Deck Concrete Topping
3.240.3 Wall Transition to E.Protect+ Deck Asphalt Topping
3.240.3.13 E.Protect+ Wall Assembly Transition to Hot Fluid Applied
3.240.4 Wall Transition to E.Protect+ Deck Pavers
3.241.1 Wall Assembly Transition to Deck Assembly w/Concrete Topping
3.241.2 Wall Transition to E.Protect Deck Concrete Topping
3.241.3 Wall Transition to E.Protect Deck Asphalt Topping
3.241.4 Wall Transition to E.Protect Deck Pavers
3.243.1 Wall Assembly Transition to Deck Assembly w/Pedestal Pavers
3.247.1 Wall Assembly Termination Transition to Self Adhered Membrane
3.248.1 Wall Transition to Shoring (Plan View)
3.260.1 Wall Inside-Outside Corner Detail
3.261.1 Wall to Footing Cold Joint
3.342.1 Shoring Assembly Transition to Deck Assembly w/Asphalt Topping