County of Los Angeles Approval
SPECIFICATION 2018 E.Protect+ Below Grade
SPECIFICATION 2018 E.Protect+ Shoring Walls
System Overview E.Protect+ Shoring
3.300.1 Shoring Standard Assembly
3.300.1.1 Shoring Standard Assembly with Insulation
3.300.2 Shotcrete Shoring Assembly
3.301.1 Shotcrete Shoring Assembly
3.302.1 Shoring Back Lagging Assembly
3.302.2 Shoring Back Lagging at Slab to Wall
3.303.1 Sheet Pile Assembly
3.303.2 Sheet Pile Assembly w/Plywood
3.303.3 Sheet Pile Assembly w/Plywood & Drainboard
3.310.3 SHORING WALL EBASE 316 OVERLAP
3.310.4 SHORING WALL E.SHIELD 205B OVERLAP
3.312.1 Shoring e.hanger Detail
3.312.2 Shoring Nailing Pattern for e.hanger
3.320.1 Shoring Penetration Pipe
3.320.2 Shoring Penetration Pipe Link-Seal
3.321.1 Shoring Penetration Rebar Wire Tie
3.322.1 Shoring Penetration Single Bar Tie Back Non-Detentioned
3.322.2 Shoring Penetration Multiple Cable Tie Back Non-Detentioned
3.323.1 Shoring Penetration Tie Back Detentioned Block Out
3.323.2 Shoring Detentioned Tie-Back
3.324.1 Shoring Penetration Tie Back Soil Nail Cover
3.325.1 Shoring Penetration Raker Detail
3.327.2 Shotcrete Shoring Asssembly @ Soil Nail Blockout
3.331.1 Shoring Termination @ Grade
3.331.2 Shoring Termination @ Grade W Cementitious Board
3.331.3 Shoring Standard Termination w Limited Access
3.340.1.1 Shoring Wall Assembly - Wood Lagging - Transition to Deck Assembly
3.340.1.1.01 E.Protect+ Shoring Wall Assembly - Wood Lagging - Transition to E.Proformance Deck Assembly
3.340.1.1.02 E.Protect+ Shoring Wall Assembly - Wood Lagging - Transition to E.Protect Deck Assembly
3.340.2.1 Shoring Wall Assembly - Wood Lagging - Transition to Deck Assembly with Concrete Topping
3.340.2.1.01 E.Protect+ Shoring Wall Assembly - Wood Lagging - Transition to E.Proformance Deck Assembly with Concrete Topping
3.340.2.1.02 E.Protect+ Shoring Wall Assembly - Wood Lagging - Transition to E.Protect Deck Assembly with Concrete Topping
3.340.3.1 Shoring Wall Assembly - Wood Lagging - Transition to Deck Assembly with Asphalt Topping
3.340.3.1.01 E.Protect+ Shoring Wall Assembly - Wood Lagging - Transition to E.Proformance Deck Assembly with Asphalt Topping
3.340.3.1.02 E.Protect+ Shoring Wall Assembly - Wood Lagging - Transition to E.Protect Deck Assembly with Asphalt Topping
3.340.4.1 Shoring Wall Assembly - Wood Lagging - Transition to Deck Assembly with Pedestal Pavers
3.340.4.1.01 E.Protect+ Shoring Wall Assembly - Wood Lagging - Transition to E.Proformance Deck Assembly with Pedestal Pavers
3.350.1.01 E.Protect+ Shoring Assembly Transition to E.Proformance Shoring Assembly
3.350.2.01 E.Protect+ Shoring Assembly Transition to E.Proformance Shoring Assembly w/Rock Pocket
3.350.3.01 E.Protect+ Shoring Assembly Transition to E.Proformance Shoring Assembly w/Side Drain
3.360.1 Shoring Back Lagged Cross Strap Preparation
3.372.1 Shoring Assembly - Cold Joint - Plan view
3.380.1 Shoring Elevator Pit