City of Los Angeles Methane Approval
County of Los Angeles Approval
SPECIFICATION 2018 E.Proformance Below Grade
SPECIFICATION 2018 E.Proformance Underslab
SPECIFICATION 2019 e.vent Vapor Collection System
System Overview E.Proformance Underslab
1.100.1 Underslab Assembly
1.100.2 Underslab Assembly w/Protection Slab
1.100.3 Underslab Assembly w/Base & Protection Slab
1.100.4 Underslab Assembly w/Base Slab
1.110.1 Underslab E.Base 205 Overlap
1.120.1 Underslab Pipe Penetration
1.121.1 Underslab Precast Pile Penetration
1.122.1 Underslab Auger Cast Pile Penetration
1.122.2 Underslab Auger Cast Pile Penetration w/Base Slab
1.122.3 Underslab Auger Cast Pile Penetration w/Base & Protection Slab
1.122.4 Underslab Auger Cast Pile Penetration w/Base & Protection Slab w/Multiple Rebar
1.123.1 Underslab H-Pile Penetration
1.125.2 Underslab Pipe Hanger Penetration
1.126.1 UNDERSLAB PENETRATION RAKER FOOTING - OPTION 1
1.126.2 UNDERSLAB PENETRATION RAKER FOOTING - OPTION 2
1.130.1 Underslab Grade Beam 6" Termination
1.130.2 Underslab Grade Beam 3" Termination
1.131.1 Underslab Termination @ Wall
1.140.1 Underslab Assembly Transition to Shoring Assembly
1.140.1.12 E.Proformance Underslab Assembly Transition to E.Proformance S Shoring Slipsheet Assembly
1.140.2 Underslab Assembly Transition to Shotcrete Shoring Assembly
1.140.2.12 E.Proformance Unsderslab Assembly Transition to E.Proformance S Shotcrete Shoring Slipsheet Assembly
1.140.3 Underslab Assembly Transition to Sheet Pile Shoring Assembly
1.140.3.12 E.Proformance Underslab Assembly Transition to E.Proformance S Sheet Pile Shoring Slipsheet Assembly
1.141.1 Underslab Construction Joint - Step One
1.141.2 Underslab Construction Joint - Step Two
1.141.3 Underslab Raker Pad @ Mat Slab Construction Joint - Step One
1.142.1 Underslab Below Grade Beam Assembly
1.143.1 Underslab Assembly Transition to to Overexcavated Wall
1.170.1 Underslab Assembly Repair