E.Proformance Shoring

E.Proformance Shoring is a pre-applied blindside waterproofing system for use on below-grade foundation walls on projects with zero-lot-line construction. Designed for full integration with the building foundation walls, E.Proformance is an easy, simple and robust waterproofing solution.

E.Proformance Shoring can also be applied without an underslab barrier for sites with minimal waterproofing risk or in conjunction with other E.Series systems when applied above the design water table.

Appropriate for cast-in-place poured concrete or structural shotcrete, and can be applied with different types of shoring methods including soldier pile, back lagging, shotcrete soil nail, internal rakers, caissons, secant walls and sheet piles.
E.Proformance Shoring has several benefits:

  • Redundant layers of protection become fully integrated with the building foundation.
  • Provides a high level of chemical resistance to a wide range of contaminants found in soil and groundwater.
  • Seamless.
  • Installs quickly with less weather sensitivity than exposed bentonite systems and does not require additional protection prior to the placement of concrete.
Shoring – Pre-Applied Vertical Protection System
Thickness: 90 mils
1st Layer: e.drain
2nd Layer: e.spray

When used in conjunction with the E.Proformance Underslab system, a single source warranty is available for both waterproofing, and contamination such as, methane gas, volatile organic compounds (VOC’s), or aeromantic hydrocarbons. E.Proformance Shoring can also be applied without an underslab barrier for sites with minimal waterproofing risk, or in conjunction with other E.Series systems when above the design water table.

It is compatible with cast-in-place poured concrete or shotcrete, and when applied to different types of shoring methods including soldier pile, back lagging, shotcrete soil nail, internal rakers, caissons, secant walls, and sheet piles.

E.Series
County of Los Angeles Approval
E.Series
NSF Approval 2015
E.Series
SPECIFICATION 2018 E.Proformance Below Grade
SPECIFICATION 2018 E.Proformance Shoring Walls
E.Series
PDS e.adhesive
E.Series
PDS e.catalyst
E.Series
PDS e.drain
E.Series
PDS e.fastener
E.Series
PDS e.poly
E.Series
PDS e.roll
E.Series
PDS e.shield bb
E.Series
PDS e.spray
Epro
PDS e.stop b
Epro
PDS e.stop hpl
E.Series
SDS Calcium Chloride
E.Series
SDS e.adhesive
E.Series
SDS e.catalyst
E.Series
SDS e.drain
E.Series
SDS e.poly
E.Series
SDS e.roll
E.Series
SDS e.shield bb
E.Series
SDS e.spray
E.Series
SDS e.stop b
Epro
SDS e.stop hpl
E.Series
SDS e.term strip
E.Series
SDS e.trowel
E.Series
EPRO Brochure
System Overview E.Proformance Shoring
E.Series
1.248.1 Wall Assembly Transition To Shoring Assembly - Plan View
E.Series
1.248.2 Wall Assembly Transition to Shoring Assembly - Section View
1.300.1 Shoring Assembly
1.300.1.1 Shoring Assembly with Insulation
1.300.2 Shotcrete Shoring Assembly
1.302.1 Shoring Back Lagging Assembly
1.303.1 Sheet Pile Assembly
1.303.2 Sheet Pile Assembly w/Plywood
1.310.1 Shoring E.Drain Overlap
1.310.2 SHOTCRETE SHORING E.DRAIN OVERLAP
1.311.1 Shoring E.Fastener Detail
1.311.2 Shoring E.Fastener Nailing Pattern on E.Drain
1.311.3 Shotcrete Shoring E.Fastener Detail
1.320.1 Shoring Pipe Penetration Non-Hydrostatic
1.320.2 Shoring Pipe Penetration Non-Hydrostatic w/Link-Seal
1.321.1 Shoring Wire Tie Penetration
1.322.1 Shoring Single Bar Tie Back Penetration Non-Detentioned
1.322.2 Shoring Multiple Cable Tie Back Penetration Non-Detentioned
1.323.1 Shoring Penetration Tie Back Block Out Detentioned
1.324.2 Back Lagged Tie Back - Step Two
1.324.2 Back Lagged Tie Back -Step One
1.325.1 Shoring Raker Penetration Blockout
1.326.1 Shoring Nelson Stud Penetration - Option 1
1.326.2 Shoring Nelson Stud Penetration - Option 2
1.331.1 Shoring Termination @ Grade
1.331.2 Shoring Termination @ Grade w/Cementious Board
1.331.3 Shoring Standard Termination w/Limited Access
1.340.1 Shoring Transition to E.Protect+ Deck
1.340.2 Shoring Transition to E.Protect+ Deck Concrete Topping
1.340.3 Shoring Transition to E.Protect+ Deck Asphalt Topping
1.340.3.15 E.Proformance Shoring Assembly Transition to Hot Fluid Applied
1.340.4 Shoring Transition to E.Protect+ Deck Pavers
1.341.1 Shoring Transition to E.Protect Deck
1.341.2 Shoring Transition to E.Protect Deck Concrete Topping
1.341.3 Shoring Transition to E.Protect Deck Asphalt Topping
1.341.4 Shoring Transition to E.Protect Deck Pavers
1.360.1 Shoring Backlagged Cross Strap Preparation
1.380.1 Shoring Elevator Pit
E.Series
2.350.1.01 E.Protect Shoring Assembly Transition to E.Proformance Shoring Assembly
E.Series
2.350.2.01 E.Protect Shoring Assembly Transition to E.Proformance Shoring Assembly w/Rock Pocket
E.Series
2.350.3.01 E.Protect Shoring Assembly Transition to E.Proformance Shoring Assembly w/Side Drain
E.Series
3.350.1.01 E.Protect+ Shoring Assembly Transition to E.Proformance Shoring Assembly
E.Series
3.350.2.01 E.Protect+ Shoring Assembly Transition to E.Proformance Shoring Assembly w/Rock Pocket
E.Series
3.350.3.01 E.Protect+ Shoring Assembly Transition to E.Proformance Shoring Assembly w/Side Drain