2.241.1 Wall Assembly Transition to Deck Assembly w/Concrete Topping
County of Los Angeles Approval
SPECIFICATION 2018 E.Protect Decks
System Overview E.Protect Deck
2.240.1 Wall Assembly Transition to Deck Assembly
2.242.1 Wall Assembly Transition to Deck Assembly w/Asphalt Topping
2.243.1 Wall Assembly Transition to Deck Assembly w/Pedestal Pavers
2.340.1 Shoring Assembly Transition to Deck Assembly
2.341.1 Shoring Assembly Transition to Deck Assembly w/Concrete Topping
2.342.1 Shoring Assembly Transition to Deck Assembly w/Asphalt Topping
2.400.2 Insulated Deck Standard Assembly
2.400.3 Pedestal Paver Deck Standard Assembly
2.400.4 Insulated Pedestal Paver Deck Standard Assembly
2.400.5 Paver on Mortat Bed Deck Standard Assembly
2.400.6 Paver on Sand Bed Deck Standard Assembly
2.410.1 Deck Protection Course Overlap
2.420.1 Deck Pipe Penetration
2.430.1 Deck Assembly Termination Detail
2.431.1 Deck Planter Termination Assembly
2.440.1 Deck Assembly Up Turn
2.440.2 Deck Assembly Up Turn
2.451.1 DECK CRACK 1/16" OR LESS
2.452.1 DECK CRACK 1/4" OR LESS, GREATER THAN 1/16"